TR
ENG
Residential

Location: Istanbul, Turkey

Client: Astas Gayrimenkul Yatirim ve Turizm A.S, Turkey

Project Description: All architectural, mechanical and electrical works of Astoria Kempinski Residences building.

Completion Date: June, 2007

Astas Astoria Kempinski Residence

4. Levent Otas Residential Complex


Location: Istanbul, Turkey

Client: Borova Holding A.S., Turkey

Project Description: Residential complex, covering 14,200 m2, 6 blocks, each seven storey, reinforced concrete buildings, consisting of 100 apartments.

Completion Date: January, 1986

Location: Istanbul, Turkey

Client: Borova Holding A.S., Turkey

Project Description: The project consisted of three apartment blocks, 8 floors reinforced concrete buildings. First stage was completed in June 1983 and the second one in September 1987.

Completion Date: September, 1987

Ulus Housing Complex


Location: Istanbul, Turkey

Client: Emlak Konut A.S., Turkey

Project Description: The project consisted of 12 reinforced concrete blocks of 11 storey each, with a total construction area of 52,208 m2. Project is composed of 400 apartments, each building has 2 elevators and private heating system. Hard and soft landscaping, utilities and a children play area of 2,000 m2.

Completion Date: March, 1994

Bahcelievler Housing Complex

Gebze Mass Housing


Location: Izmit, Turkey

Client: Emlak Konut A.S., Turkey

Project description: The project consisted of 10 reinforced concrete blocks of 9 storey each. The project is composed of 364 apartments and 9 shopping units. Electromechanical and all external works are included in the scope of the project.

Completion date: 1994
Location: Izmit, Turkey

Client: Emlak Konut A.S., Turkey

Project Description: The project of consisted of two parts. Part I included 33 reinforced conrete residential blocks of 8 storey each composed of 504 apartments. Electromechanical works, infrastructure, hard and soft landscaping, utilities, in-site roads and lighting were included on the total area of 48,000 m2.

Part II included the construction of 10 reinforced concrete residental blocks of 10 story each composed of 410 apartments. Electromechanical works, infrastructure, hard and soft landscaping utilities, in-site roads and lighting were included.
Completion Date: July, 1997

Mutlukent Mass Housing I & II

OLYMPUS DIGITAL CAMERA

Location: Izmit, Turkey

Client: Project Implementation Unit of Turkey

Project Description: The project consisted of 522 apartments in 50 blocks. The infrastructural works were included. These works were sewage, drinking water, electrical works, lighting, asphalt and concrete roads.

Completion Date: May, 2001

HWGK2 Golcuk Mass Housing

AD3 Adana Tefer Mass Housing


Location: Adana, Turkey

Client: Emlak Konut A.S., Turkey

Project Description: The project consisted of 500 apartments, parking area, sidewalks, hard and soft landscaping, asphalt and concrete roads, electrical infrastructural works, drainage water and sewerage works.

Completion Date: September, 1999

SBD-1 Golyaka & Kaynasli Mass Housing


Location: Kaynaşlı ve Gölyaka, Turkey

Project description: Completion of outstanding works for 53 apartment blocks including mechanical, electrical works and finishing works. Also in-site and off-site infrastructure and road works plus landscaping.

Completion Date: June, 2004


Location: Baku, Azerbaijan

Client: Qlbal Compani Investment MMC, Azerbaijan

Project Description: The project consisted of 36 apartments with 7 normal and 1 penthouse floor with a indoor swimming pool.

Completion Date: January, 2009

ISR Residence

Soleville


Location: Riga, Latvia

Client: Sia Afi Investments, Latvia

Project Description: The project consisted of 494 units in 3 blocks with sport facilities of total 56.000 m2 covered area including infrastructure and landscaping.

Completion Date: October, 2008

Cengelkoy Villas

Location : Istanbul, Türkiye

Client: Mr. Dinç Bilgin and his partners

Project description : The project consisted of 4 villas. Each of villas had a 3-storey reinferced concrete. Each villa was very luxurious with copper roofing, imported finishing material, private swimming pool. Utilities like water, sewer and electricity were installed. External works are composed of fair face reinforced concrete perimeter wall, granite finish internal walls and landscaping.

Completion date: October, 1988

Otagtepe Villas


Location : Istanbul, Türkiye
Client: Borova Holding A.S. Türkiye

Project description : 26 reinforced concrete buildings, hard and soft landscaping, utilies and inner ring road with asphalt pavement. The following sporting facilities have been constructed swimming pool, tennis courts and children playground.

Completion date: September, 1988

Tarhuna Farm Houses

Location: Tarhuna, Libya

Client: Tarhuna, Secratariat of Housing, Libya

Project Descripton: The project consisted of 118 farm houses. Each farm house has a 250 m2 private garage and underground water tank. Electromechanical works and access road of each villa were included.

Completion Date: May, 1984
Nurova İnşaat Taahhüt ve Tic.A.Ş.
Halaskargazi Cad. Doktor Şevket Bey Sok. Konur Apt.
No:2 Kat:6 34360 Şişli-İstanbul Fax: +90 212 267 50 86
Email us: nurova@nurova.net
Call Us : +90212 240 7919